Snyder Environmental performed asbestos abatement on the old War Memorial Stadium press box prior to its demolition to make way for a newer media center. The project involved abatement of the structure’s exterior sheeting, which was a galvanized metal with an asbestos-containing coating. The project required large aerial lifts and specifically designed rigging to remove and safely lower the panels for packaging and proper disposal.